Structural Rebuild covers load-bearing repair through final inspection, coordinated with your Kent building department at every stage.
📞 Call +1-866-484-1409 Now
One licensed team accountable for the whole scope.
Load-bearing repairs meet current Kent, OH building code.
Change orders require your written approval.
We keep the project moving on a schedule you can plan around.

Inspected before any finish work covers it up.
Fire-damaged trusses replaced with engineered lumber matched to span.
We manage the timeline so it doesn't stall the project.
Installed to code once framing passes inspection.
Trim, doors, and cabinetry complete the rebuild's finished look.
Certificate of occupancy coordinated with Kent inspectors.
+1-866-484-1409 connects you to a live Kent, OH dispatcher.
Initial framing and load evaluation included.
Full rebuild scope documented with a written price and schedule.
Nothing closes out until final inspection passes.
"The framing repair passed inspection on the first try, which our contractor friend said doesn't always happen." — Homeowner, Kent
"They handled all the permit scheduling with the city, which would've been a nightmare for us to manage." — Homeowner, Kent, OH
"The project stayed on the schedule they gave us at the start, which surprised us given the scope." — Homeowner, Kent
Yes, we coordinate all required permits with your local Kent office.
Most projects run six to twelve weeks from permit to final inspection.
Yes, full GC licensing covers the entire rebuild scope.
When damage warrants it, engineer sign-off is included.
We provide the paperwork adjusters need.
We keep Kent rebuild projects on schedule by managing permitting directly.
